NEWPLAN has expertise in Hydropower, Transmission & Distribution, Dams, Solar Power, Thermal Generation.

Stringing for the Mbarara - Mirama 220kV Interconnection project
Namanve Thermal plant, NEWPLAN was a consultant to Jacobsen in the Feasibility Study, Construction supervision and Environmental Management

 

 Project Title

 Country

Client / Funder

Project
Mgmt

Sub-stations

Trans. & Dist. Lines

Power Econ. 

EIA/SIA

RAP

Feasi-bility Study

Tender Docs.

Construction Supervision

Consultancy Services for Collecting Data, Preliminary Design and Establishment of Technical Specifications for Rehabilitation Works of Ntaruka Hydropower Plant

Rwanda

Energy Utility Corporation Ltd

 

 

 

 

 

 

 

Study for Grid Stability and Availability for Sironko HPP Project in Eastern Uganda

Uganda

Norfund

 

 

 

 

 

 

Grid interconnection study for a 10MW Solar PV Plant in Mayuge

Uganda

Emerging Power Uganda Ltd

 

 

 

 

 

 

Buliisa Gas to Power Generation Permitting Consultancy Services

Uganda

TOTAL E&P UGANDA B.V

 

 

 

 

 

 

 

 

 

Consultancy Services for Gas to Power Permitting and Licensing

Uganda

CNOOC Uganda  Ltd

 

 

 

 

 

 

 

 

 

Consultancy Services for Review of Engineering Designs, Preparation of Bidding Documents and Procurement Support for the proposed Construction of Lot 1: Kiganda-Mile 16 with tee-off Katabalanga and Kyabamirizi(109Km) project under ERT 111

Uganda

Rural Electrification Agency (REA)

 

 

 

 

 

Master plan and detailed design for Kabaale airport in Hoima district

Uganda

Ministry of  Energy, ICAO & UCAA

 

 

 

 

 

Feasibility study for 220kV Iringa-Mbeya interconnection project

Tanzania

NELSAP/ AECOM

 

 

 

220kV Rwanda-DRC interconnection project

Rwanda

NELSAP

 

 

 

 

 

 

Feasibility study for 220kV Uganda-DRC interconnection project in South Western Uganda(Kasese) and North Eastern DRC (Bunia, Butembo and Beni)

DRC and Uganda

NELSAP/ AECOM

 

 

Consultancy services for Project Management and supervision for the 220kV interconnection of electric grids of Nile Equatorial Lakes (NEL) countries i.e. Jinja, Tororo and Mbarara.

Uganda

NELSAP & UETCL

 

 

 

 

33kV Rural Electrification Projects in Gulu-Adjumani-Moyo, Kiiru-Apala-Adwari with tee-off to Morulem, Rackoko-Awere-Lalogi, with distribution transformers and associated LV lines

Uganda

REA

 

 

 

 

 

Grid extensions in Mubende, Mukono, Kibaale, Masaka, Gomba, Butambala, Luweero, Nakasongola, Mpigi (Feasibility studies)

Uganda

REA

 

 

 

Feasibility studies for Nengo HPP (7.5MW) and 33kV TL (9.5km) in Rukungiri and Kanungu districts in Western Uganda

Uganda

Jacobsen Electro AS Norway

 

 

Construction supervision for  Electricity Grid and Power generation for Bugala Island

Uganda

REA

 

Bugoye Small HPP, with associated power transmission and distribution lines

Uganda

Tronder Power Ltd

Technical services to Namanve Thermal Power Plant

Uganda

Jacobsen Electro AS Norway

 

 

 

Electricity Grid and Power generation for Bugala Island,

Uganda

REA

 

Feasibility study for Grid Supplementation with Off-grid private generation

Uganda

REA

 

 

 

 

 

 

SIDA II, 33kV Rural Electrification Power Projects in, Kyenjojo, Namayemba, Bundibugyo and Pader-Abim Districts

Uganda

REA/ Norplan AS